WetlandCare Australia -Projects Archive
Upper Tweed Streambank Stabilisation and Riparian Enhancement Project
Summary:
The Upper Tweed River sub-catchment is the headwaters of the Tweed River in north-eastern NSW. The Upper Tweed sub-catchment was identified in the Northern Rivers Catchment Management Authority Draft Catchment Action Plan (2006) as a high priority sub-catchment for protection and rehabilitation as it has "significant conservation value and contributes to town water supply" (NSW Department of Land and Water Conservation 1999).
